Case Study: 1776 by David Burke featuring Topgolf Swing Suite

David Burke featuring Topgolf Swing Suite

Immersive pre-con work was a key component in converting a 12,000 square foot space in an office building into award winning destination 1776 by David Burke featuring Topgolf Swing Suite. A high-performance kitchen, beautiful bar and dining areas, and technology driven swing suites had to be carefully incorporated into the building in the heart of Morristown, NJ. Read more about how SCCG facilitated the transformation.

Share the Post:
Pre-Construction Construction Management General Contracting Call Now 908-517-3905
Pre-Construction Construction Management General Contracting Call Now 908-517-3905